408- 9515
Ribbon Cable Notcher 854449- [ ]
5 of 5Rev C Tyco Electronics Corporation
6.3. Visual Inspection
1. Remove all lubrication and accumulated film by
immersing the dies in a suitable commercial
degreaser that will not damage the dies.
2. Make certain all components are in place.
3. Check all surfaces for wear. Replace worn parts.
4. Inspect the upper tooling and dies for flattened,
chipped, or broken areas.
7. REPLACEMENT AND REPAIR
For location of parts and replacement component
part numbers, refer to the drawing included with
the notcher.
Replacement parts are listed in Figure 6. Parts other
than those listed should be replaced by Tyco
Electronics to ensure quality and reliability. Order
replacement parts through your representative, or call
1--800--526--5142, or send a facsimile of your
purchase order to 717--986--7605, or write to:
CUSTOMER SERVICE (038--035)
TYCO ELECTRONICS CORPORATION
PO BOX 3608
HARRISBURG PA 17105--3608
REPLACEMENT PARTS
PART
NUMBER
DESCRIPTION
QTY PER
NOTCHER
854438--1 PLATE, Pressure, 2.54 [.100] 1
854443--1 PLATE, Pressure, 3.96 [.156] 1
23846--7 SPRING, Compression 4
854435--1 SUBASSEMBLY, U pper Die Plate 1
Figure 6
7.1. Upper Tooling Replacement
1. Disconnect power from the power unit.
2. Remove the notcher from the power unit.
3. Remove the two socket head screws securing
the upper tooling to the upper die plate
subassembly. Remove the retaining ring, upper die
plate subassembly, and upper tooling. Note
orientation of upper tooling.
4. Remove the pressure plate and the four
compression springs.
5. Locate the cable stop plate against the pressure
plate dowel posts. Secure the cable stop plate with
the two socket head cap screws.
6. Place new upper tooling onto the upper die plate
subassembly, and insert, but do not tighten, the
socket head cap screws. Slide the upper die plate
subassembly onto the pressure plate dowel pins.
Make sure that the upper tooling is properly
oriented.
7. Gently lower the upper die plate subassembly
until the upper tooling is fully engaged in the die.
T ighten the two socket head cap screws that
secure the upper tooling. Remove the upper die
plate subassembly.
8. Re--install the pressure plate, compression
springs, and upper die plate subassembly.
Make sure that the compression springs are
properly seated in their counterbores.
7.2. Repair
For customer repair service, contact a representative
at 1--800--526--5136.
8. REVISION SUMMARY
Revisions to this instruction sheet include:
S Updated instruction sheet to corporate
requirements
NOTE
i
NOTE
i
NOTE
i