VS-SD803C08S10C

Mounting Instructions for Hockey-PUK
APPLICATION NOTE
Application Note
www.vishay.com
Vishay Semiconductors
Revision: 28-Jun-13
4
Document Number: 95544
For technical questions within your region:
DiodesAmericas@vishay.com
,
DiodesAsia@vishay.com
,
DiodesEurope@vishay.com
THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT
ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
Fig. 7 - Step 5: Rotate the heatsink assembly 90 degrees and hold the top heatsink with one hand, so it does not rotate, while tightening
the bolts. Tighten each bolt alternately a quarter turn until the clamp indicator washer spins free (Bellville washer type clamp).
For spring bar type clamps, there is an indicator arm that snaps into place.
Fig. 8 - Step 6: Check to make sure the two mounting surfaces are still parallel. Tighten each bolt a 1/10
th
turn more.
Do not tighten beyond this point.

VS-SD803C08S10C

Mfr. #:
Manufacturer:
Vishay
Description:
Rectifiers 800 Volt 845 Amp
Lifecycle:
New from this manufacturer.
Delivery:
DHL FedEx Ups TNT EMS
Payment:
T/T Paypal Visa MoneyGram Western Union