B7
BFrame Kit Assembly Process
Assembly Process Figure 1
Mount the connectors(68-contact connectors,
back connectors) and other parts to the
printed circuit board (PCB).
NOTE :The procedure for the IC9 Series (suited to the
68-contact connectors and card bus) is to mount
the connector body, then insert the ground plate
and fasten the lead portion by hand.
Assembly Process Figure 2
Insert the PCB mounting part to panel B
(frame press fitting item).
Assembly Process Figure 3
Use the assembly jig (described below) to
insert panel A. (Press fit + lock)
Assembly Process Figure 4
Assembled item
Assembly Process Figure 5
Affix the label to the indented portion of the panel.
NOTE :
Hirose Electric Co. Ltd. will not provide label services.
(Please refer to the Recommended Label Dimensions
Diagram of Page 2.)
Assembly Jig
(The photograph shows the hand press model.)
Panel B
Panel A
Part Number
NX1-/CVCK-MP
NX1-/CVCK-MP(01)
CL No.
902-3530-7
902-3530-7(01)
Classification
Without hand press
With hand press