2007842-3

108-2351
Rev H1
4 of 8
Test Description
Requirement
Procedure
ENVIRONMENTAL
Thermal shock
See Note.
EIA-364-32, Test Condition I. Subject
mated specimens to 5 cycles between
-55 and 85°C with 30 minute dwells at
temperature extremes and 1 minute
transition between temperatures.
Humidity/temperature cycling.
See Note.
EIA-364-31, Method III.
Subject mated specimens to 500 hours
between 25 and 65°C at 80 to 100%
RH.
Temperature life.
See Note.
EIA-364-17, Method A, Test Condition
3, Test Time Condition C. Subject
mated specimens to 85°C for 500
hours.
Mixed flowing gas.
See Note.
EIA-364-65,Class IIA (4gas). Subject
specimens to environmental Class IIA
for 20 days (10 days unmated,
followed by 10 days mated). Measure
LLCR every 5 days.
Dust.
See Note.
EIA-364-91.
Subject unmated specimens to #1
(benign) dust for 1 hour.
Specimens shall not be removed
from the chamber for a minimum of
1 hour after completion of the test.
NOTE
Shall meet visual requirements, show no physical damage, and meet requirements of additional
tests as specified in the Product Qualification and Requalification Test Sequence shown in
Figure 2.
Figure 1 (end)
108-2351
Rev H1
5 of 8
3.6. Product Qualification and Requalification Test Sequence
Test or Examination
Test Group (a)
1
2
3
4
5
6
7
Test Sequence (e)
Initial Examination of Product
2
1
1
1
1
1
1
LLCR
4,6
3,5
2,5,7,9
2,4,7,9,11
2,4,6,8,10,12,14,16,18
Insulation Resistance
2,6
Withstanding voltage
3,7
Compliant pin interface resistance
3,6
Sinusoidal vibration
6
Mechanical shock
8
Durability
3(f),8(f)
3(f),10(f)
5(g),17(g)
Mating force
3,8
2,7
Unmating force
7
6
Compliant pin insertion force
1
2,5(d)
Compliant pin retention force
4,7
Minute/thermal disturbance
15
Thermal shock
4
4
Humidity/temperature cycling
6
5
Temperature life
5
3(i)
Mixed flowing gas
7,9,11,13
Dust
4
5
Final examination of product
9
8
10
12
19
8
8(h)
NOTE
a. See Paragraph 4.1.A.
b. Separate specimens must be run for LLCR and discontinuity monitoring.
c. This test group not mounted on PCB’s.
d. Remove and replace specimens on PCB 1 time.
e. Numbers indicate sequence in which tests are performed.
f. 100 cycles only.
g. 98 cycles only.
h. Cross section compliant pin joints (initial and reworked connectors).
i. 300 HOURS.
Figure 2
108-2351
Rev H1
6 of 8
4. QUALITY ASSURANCE PROVISIONS
4.1. Qualification Testing
A. Specimen Selection
Specimens shall be prepared in accordance with applicable instruction sheets and shall be
selected at random from current production. Test groups 1, 2, 3, 4, 6 and 7 shall each consist of 5
mated pairs. Test group 5 shall consist of 10 mated pairs.
B. Test Sequence
Qualification inspection shall be verified by testing specimens as specified in Figure 2.
4.2. Requalification Testing
If changes significantly affecting form, fit or function are made to the product or manufacturing process,
product assurance shall coordinate requalification testing, consisting of all or part of the original testing
sequence as determined by development/product, quality and reliability engineering.
4.3. Acceptance
Acceptance is based on verification that the product meets the requirements of Figure 1. Failures
attributed to equipment, test setup or operator deficiencies shall not disqualify the product. If product
failure occurs, corrective action shall be taken and specimens resubmitted for qualification. Testing to
confirm corrective action is required before resubmittal.
4.4. Quality Conformance Inspection
The applicable quality inspection plan shall specify the sampling acceptable quality level to be used.
Dimensional and functional requirements shall be in accordance with the applicable product drawing and
this specification.
Figure 3
LLRC Measurement Points

2007842-3

Mfr. #:
Manufacturer:
TE Connectivity
Description:
IMP100S,H,V5P10C,LG,REW46,5.5
Lifecycle:
New from this manufacturer.
Delivery:
DHL FedEx Ups TNT EMS
Payment:
T/T Paypal Visa MoneyGram Western Union