EZ80F910100KIT

An Company
Copyright ©2010 by Zilog
®
, Inc. All rights reserved.
www.zilog.com
Introduction
This quick qtart guide provides instructions and configuration information for
Zilog’s eZ80F91 Mini Ethernet module, eZ80Acclaim!
®
Modular Development System
(MDS) adapter board, and associated components. The eZ80F910100KIT and
eZ80F910200KITG modular development kits are covered in this quick start guide.
Kit Contents
For a complete list of material shipped with the eZ80F91 Modular Development Kit
(eZ80F910200KITG), refer to eZ80F910200KITG eZ80F91 Series Development Kit
Packing List (PAK0015).
System Requirements
Table 1 lists the system requirements for running ZDS II.
Table 1. ZDS II System Requirements
Recommended Configuration Minimum Configuration
PC running MS Windows XP
Professional
PC running MS Win2000–SP4/WinXP Professional
Pentium III/500 MHz or higher
processor
Pentium II/233 MHz processor
128 MB RAM 96 MB RAM
110 MB hard disk space 25 MB hard disk space (documentation not
installed)
Super VGA video adapter Super VGA video adapter
CD-ROM drive CD-ROM drive
One or more RS-232
communication port
One or more RS-232 communication port
USB high-speed port USB high-speed port
eZ80F91 Modular
Development Kit
Quick Start Guide
QS004611-0810
eZ80F91 Modular Development Kit
QS004611-0810 Page 2 of 10
Installation Overview
The eZ80F91 Mini Ethernet module is preinstalled on the eZ80Acclaim!
®
MDS adapter
board. To set up the development kit, install the ZDS II software. Connect the kit to PC,
using the USB Smart Cable or Serial Smart Cable, as appropriate. Connect power to the
adapter board. Figure 1 displays the eZ80F91 Modular Development Kit.
Previous versions of the development kit used the Serial Smart Cable. New
kits as of June 2006 uses the USB Smart Cable.
Follow the steps below to install the cable available with your kit:
1. Install the ZDS II software as described in Installing the ZDS II Software and Kit
Documentation on page 3.
Figure 1. The eZ80F91 Modular Development Kit
2. Connect your PC to the eZ80Acclaim! MDS adapter board as follows:
(a) If you are using the Serial Smart Cable, follow the instructions in Connecting the
Serial Smart Cable to Your Computer on page 3.
(b) If you are using the USB Smart Cable (not included with this kit), follow the
instructions in Installing the USB Smart Cable on page 3.
3. Connect the 5 V DC power supply to the adapter board.
4. Connect the development kit to your PC and run the supplied sample project as
described in Running Sample Projects on page 6.
For complete details on developing an application for the development kit, refer to Zilog
Developer Studio II–eZ80Acclaim!
®
User Manual (UM0144), and eZ80F91 Modular
Development Kit User Manual (UM0170).
Note:
eZ80F91 Modular Development Kit
QS004611-0810 Page 3 of 10
Installing the ZDS II Software and Kit Documentation
Follow the steps below to install ZDS II and eZ80F91 development kit documentation:
1. Insert the ZDS II CD into the CD-ROM drive. DemoShield launches automatically. If
DemoShield does not launch automatically, open the Windows Explorer, browse to
your CD-ROM drive, and double-click
launch.exe to launch the installer.
2. Click the Install Products button from the main installer menu. From the product
installer list you can choose to install only ZDS II, or ZDS II and associated documen-
tation. You can also copy the documentation directly from your CD-ROM drive to
your hard disk using Windows Explorer.
Zilog recommends registering your new ZDS II software. By registering
ZDS II, you have access to free technical support, software components, and
other tools that only registered Zilog customers have. To register online, go to
http://support.zilog.com/CustomerPortal/.
Connecting the Serial Smart Cable to Your Computer
Connect the Serial Smart Cable 9-pin DB9 serial connector to a COM port on your com-
puter.
Connecting the Serial Smart Cable to the MDS Adapter Board
Attach one end of the six-conductor ribbon cable to the Smart Cable 6-pin DBG connec-
tor. See Figure 2 on page 5. Attach the free end of the ribbon cable to the connector on the
eZ80Acclaim!
®
MDS adapter board. The connectors are keyed to ensure proper align-
ment.
Installing the USB Smart Cable
You can install the USB Smart Cable for the following operating systems:
Windows Vista-32
Follow the steps below to install the USB Smart Cable for Windows Vista-32:
1. Connect the USB Smart Cable to the host PC. The Found New Hardware dialog box
is displayed.
2. Select Locate and install driver software (recommended). The Driver Software
Installation window is displayed, and then the Found New Hardware-USB Smart
Cable dialog box is displayed.
Note:

EZ80F910100KIT

Mfr. #:
Manufacturer:
ZiLOG
Description:
Development Boards & Kits - Other Processors EZ80F91 Acclaim Kit
Lifecycle:
New from this manufacturer.
Delivery:
DHL FedEx Ups TNT EMS
Payment:
T/T Paypal Visa MoneyGram Western Union

Products related to this Datasheet