TC58NVG2S0HTAI0
2013-07-05C
19
Auto-Program Operation with Data Cache Timing Diagram (3/3)
(Note) Make sure to terminate the operation with 80h-10h- command sequence.
If the operation is terminated by 80h-15h command sequence, monitor I/O 6 (Ready / Busy) by
issuing Status Read command (70h) and make sure the previous page program operation is
completed. If the page program operation is completed issue FFh reset before next operation.
70h
t
CLS
t
ALS
t
DS
t
DH
WE
CLE
CE
ALE
RE
BY/RY
: V
IH
or V
IL
t
CLH
t
CH
t
CS
t
CLS
t
DS
t
DH
t
ALH
I/O
: Do not input data while data is being output.
t
CS
2
t
DH
t
DS
t
DH
t
PROG (*1)
t
WB
t
DS
t
ALH
t
ALS
D
IN
4351
Continues from 2 of previous page
(
*1) t
PROG
: Since the last page programming by 10h command is initiated after the previous cache
program, the t
PROG
during cache programming is given by the following equation.
t
PROG
= t
PROG
of the last page + t
PROG
of the previous page − A
= (command input cycle + address input cycle + data input cycle time of the last page)
If “A” exceeds the t
PROG
of previous page, t
PROG
of the last page is t
PROG
max.
80h
CA0
to 7
CA8
to 12
PA0
to 7
PA8
to 15
PA16
D
IN
N
D
IN
+
10h Status