16
Tape and Reel Dimensions - APDS-9300
17
Moisture Proof Packaging Chart
All APDS-9300 options are shipped in moisture proof package. Once opened, moisture absorption begins.
This part is compliant to JEDEC Level 3.
BAKING CONDITIONS CHART
Recommended Storage Conditions
Storage Temperature 10°C to 30°C
Relative Humidity Below 60% RH
Time from Unsealing to Soldering
After removal from the bag, the parts should be soldered
within seven days if stored at the recommended storage
conditions. When MBB (Moisture Barrier Bag) is opened
and the parts are exposed to the recommended storage
conditions more than seven days the parts must be baked
before reow to prevent damage to the parts.
Baking conditions
If the parts are not stored per the recommended storage
conditions they must be baked before reow to prevent
damage to the parts.
Package Temp. Time
In Reels 60°C 48 hours
In Bulk 100°C 4 hours
Note: Baking should only be done once.
UNITS IN A SEALED
MOISTURE-PROOF PACKAGE
ENVIRONMENT
LESS THAN 30 °C
AND LESS THAN
60% RH
PACKAGE IS OPENED
(UNSEALED)
PACKAGE IS
OPENED LESS
THAN 168 HOURS
NO BAKING IS
NECESSARY
PERFORM RECOMMENDED
BAKING CONDITIONS
YES
YES
NO
NO
18
Process Zone Symbol DT
Maximum DT/Dtime
or Duration
Heat Up P1, R1 25°C to 150°C 3°C/s
Solder Paste Dry P2, R2 150°C to 200°C 100s to 180s
Solder Reow P3, R3 200°C to 260°C 3°C/s
P3, R4 260°C to 200°C -6°C/s
Cool Down P4, R5 200°C to 25°C -6°C/s
Time maintained above liquidus point , 217°C > 217°C 60s to 90s
Peak Temperature 260°C -
Time within 5°C of actual Peak Temperature - 20s to 40s
Time 25°C to Peak Temperature 25°C to 260°C 8mins
The reow prole is a straight-line representation of a
nominal temperature prole for a convective reow sol-
der process. The temperature prole is divided into four
process zones, each with dierent DT/Dtime temperature
change rates or duration. The DT/Dtime rates or duration
are detailed in the above table. The temperatures are
measured at the component to printed circuit board con-
nections.
In process zone P1, the PC board and component pins are
heated to a temperature of 150°C to activate the ux in
the solder paste. The temperature ramp up rate, R1, is lim-
ited to 3°C per second to allow for even heating of both
the PC board and component pins.
Process zone P2 should be of sucient time duration (100
to 180 seconds) to dry the solder paste. The temperature
is raised to a level just below the liquidus point of the sol-
der.
Process zone P3 is the solder reow zone. In zone P3, the
temperature is quickly raised above the liquidus point of
solder to 260°C (500°F) for optimum results. The dwell time
above the liquidus point of solder should be between 60
and 90 seconds. This is to assure proper coalescing of the
solder paste into liquid solder and the formation of good
solder connections. Beyond the recommended dwell time
the intermetallic growth within the solder connections
becomes excessive, resulting in the formation of weak
and unreliable connections. The temperature is then rap-
idly reduced to a point below the solidus temperature of
the solder to allow the solder within the connections to
freeze solid.
Process zone P4 is the cool down after solder freeze. The
cool down rate, R5, from the liquidus point of the solder to
25°C (77°F) should not exceed 6°C per second maximum.
This limitation is necessary to allow the PC board and
component pins to change dimensions evenly, putting
minimal stresses on the component.
It is recommended to perform reow soldering no more
than twice.
Recommended Reow Prole
50
100 150 200 250 300
t-TIME
(SECONDS)
25
80
120
150
180
200
230
255
0
T - TEMPERATURE (°C)
R1
R2
R3
R4
R5
217
MAX 260°C
60 sec to 90 sec
Above 217°C
P1
HEAT
UP
P2
SOLDER PASTE DRY
P3
SOLDER
REFLOW
P4
COOL DOWN

APDS-9300-020

Mfr. #:
Manufacturer:
Broadcom / Avago
Description:
Ambient Light Sensors ALPS Light Sensor
Lifecycle:
New from this manufacturer.
Delivery:
DHL FedEx Ups TNT EMS
Payment:
T/T Paypal Visa MoneyGram Western Union

Products related to this Datasheet